Following a series of successful projects completed for the group, Wylde IA was appointed by Balfour Beatty Utility – Services Division in Sheffield to design a refurbishment-in-occupation scheme for their existing 22,000 sqft two-storey office building. The existing layout was cluttered, tired and did not cater for the 280 staff required, since everyone was allocated an individual desk …

.

Case Study

See the full Case Study here!

See more information about the Balfour Beatty Sheffield project here
Case Study